205.637.3115

info@liveoakengineering.com

Monday through Friday: 8 a.m. to 5 p.m.

  • Fort Benning Raw Water Pump Station, Fort Benning, GA

    Built on the banks of the Chattahoochee River, this station provides Fort Benning military and support personnel with up to eight million gallons of drinking water per day (8 MGD). In addition to adhering to sustainable design techniques, Live Oak also had to design each component to resist possible river flooding.

  • Design services include:
    – Concrete tank.
    – Pumping station.
    – Facilities designed for expansion to up to 16 MGD.
    – Sustainable design techniques.

©Live Oak Engineering, Inc. 2024. All rights reserved.